Back to results
Cover image for book Sand Control in Well Construction and Operation

Sand Control in Well Construction and Operation

By:Davorin Matanovic; Marin Cikes; Bojan Moslavac
Publisher:Springer Nature
Print ISBN:9783642256134
eText ISBN:9783642256141
Edition:0
Copyright:2012
Format:Reflowable

eBook Features

Instant Access

Purchase and read your book immediately

Read Offline

Access your eTextbook anytime and anywhere

Study Tools

Built-in study tools like highlights and more

Read Aloud

Listen and follow along as Bookshelf reads to you

Produced sand causes a lot of problems. From that reasons sand production must be monitored and kept within acceptable limits. Sand control problems in wells result from improper completion techniques or changes in reservoir properties. The idea is to provide support to the formation to prevent movement under stresses resulting from fluid flow from reservoir to well bore. That means that sand control often result with reduced well production. Control of sand production is achieved by: reducing drag forces (the cheapest and most effective method), mechanical sand bridging (screens, gravel packs) and increasing of formation strength (chemical consolidation). For open hole completions or with un-cemented slotted liners/screens sand failure will occur and must be predicted. Main problem is plugging. To combat well failures due to plugging and sand breakthrough Water-Packing or Shunt-Packing are used.